Commitment before assessment
Criteria, weights and pass thresholds are published and hash-committed before any subject is assessed. Nothing moves once the data arrives.
The criteria came first
A corporate picks a supplier after a bake-off whose criteria were never published. A standards body names a preferred auditor after a workshop. A regulator is asked to accept a conformity assessment whose underlying test cannot be rerun. What sits beneath all of it is attestation, not evidence.
Antefacts builds the layer underneath. Criteria are cryptographically committed before anyone is assessed. Scoring inputs are held back. The harness is published so any third party can rerun it and obtain the same numbers. And every evaluation carries a machine-checked record of how the decision was actually made.
Most of this market sells one blurred assurance. We separate the two claims that can honestly be made, and we are explicit that only one of them admits proof.
| Axis | What is claimed | How | Tier |
|---|---|---|---|
| Process integrity | This evaluation was conducted in accordance with its own pre-registration, and its record is unaltered | Machine-checked, on every evaluation | Proved |
| Subject performance | The system measured at a stated value, within a stated interval, under a stated configuration | Pre-registered statistics, or pre-registered scoring | Bounded Registered Never proved |
Set out in full on the method page. No evaluation we run will assert that a system is proved safe, proved correct, certified or compliant. That restraint is not modesty. It is the only position that survives a technical assessor reading the method closely, and it is what makes the first claim worth anything.
Every record is hash-linked, signed and timestamped by an authority we do not control, and the chain roots are published to independent locations so that we cannot quietly rewrite our own history. That is a hash chain in a database with independent republication: the boring, auditable construction. A distributed ledger would add nothing to the guarantee and a great deal to the doubt, so our specification prohibits one.
Criteria, weights and pass thresholds are published and hash-committed before any subject is assessed. Nothing moves once the data arrives.
Subjects receive the requirement specification. They do not receive the scoring inputs in advance, and they are barred from retaining them.
The scoring harness is published. A third party can obtain it, rerun the evaluation and check every hash without contacting us.
Append-only, hash-chained, independently timestamped, with roots republished where we do not control them.
Every participant may obtain the harness and rerun its own submission. A challenge is a defined record with a deadline and an outcome, and it enters the ledger whichever way it is decided.
Evaluations depart from plan. When ours do, the departure is recorded and published, including where the results themselves stay confidential.
Certification and notified bodies that need a defensible technical method for conformity assessment and have no intention of building one. Corporate procurement functions whose supplier selections have to survive challenge from the vendors that lost. Anyone whose signature ends up on a decision they cannot currently show the working for.
The protocol specification, the scoring harness and the machine-checked development are given away. They are released as one bundle together with the first conforming evaluation, because a specification published alone is a document, and the four published together are a demonstration.
Already here: how the method works, what it does not buy, and the rules we hold ourselves to.
From the Latin ante factum, before the fact. An antefact is a thing fixed before the event it governs: the criteria, the weights and the thresholds, sealed before any data exists. That is the whole method in one word.